Our Occupied Office Flooring Replacement process uses "lift" carpet installation to make things as easy as possible on your team.

Here’s a look at our process:
- Prior to start, ReSource Floor + Care will deliver plastic bins for personal items: pictures, books, loose papers, & other desktop / miscellaneous items.
- Our crews will move desks, furniture and workstations in order to demo existing flooring; then we’ll reinstall the flooring and reset the furniture. Workstations are gently lifted in place with tooling that’s specifically designed for this process.
- For very full or heavy file cabinets, please empty the top 1-2 drawers to make these easier to move and reset.
- Disconnect computers, unplug power & data cables, and secure computers / screens. Our team will move these items if needed, but we will not disconnect them.
- Place items from full bolsters on workstation panels inside the bins (especially for larger/taller workstations).
- Any personally identifiable information needs to be secured.
- Bins and furniture might be moved from offices into hallways and/or around the inside of the office space as needed. However, these items will not be removed from the office premises.
Want to learn more about how occupied office flooring replacement works?
- Watch this video!
- Download our PDF: ReSource Floor + Care Occupied Office Replacement Process
- Contact us to discuss how we can replace your flooring without interruption.
